System Health
Status: HealthyCore system health from mock operations records
Read-only command center for growth, content, AI, automation, and operations visibility.
System health, backups, restore readiness, smoke tests, incidents, monitoring, security, and production readiness for Blotto OS.
Blotto OS is reviewed through system health, backup evidence, restore readiness, smoke tests, incidents, and production readiness before any operational decision.
Operations warnings stay visible before readiness metrics so stale or missing evidence is not hidden.
Evidence-based operations readiness. Production readiness cannot be green when backup, restore, smoke, or incident evidence is weak.
Core system health from mock operations records
Backup exists but verification is limited
Restore readiness requires test evidence
Smoke tests passed with warnings in mock data
No open critical incident in mock data
Limited by restore and backup evidence
Core components and their operational status. Unknown critical systems prevent full production confidence.
| Component | Status | Last checked | Freshness | Impact | Next action |
|---|---|---|---|---|---|
| Backend API | Health: Healthy | 2026-06-25T08:50:00+07:00 | Freshness: Fresh | No immediate blocker from mock records. | Continue monitoring. |
| Dashboard Frontend | Health: Healthy | 2026-06-25T08:50:00+07:00 | Freshness: Fresh | No immediate blocker from mock records. | Continue monitoring. |
| PostgreSQL Database | Health: Unknown | Unknown | Freshness: Unknown | Evidence is incomplete. | Connect or record health evidence. |
| Automation Layer | Health: Degraded | 2026-06-25T08:50:00+07:00 | Freshness: Fresh | May block full production readiness until reviewed. | Review component health and audit evidence. |
Backup, restore, smoke, incident, monitoring, security, production, and release readiness are review-only.
Backup exists in mock records, but latest verification and restore evidence are limited.
Next action: Verify latest backup record before production release.
Restore readiness is partial, so production recovery confidence is not complete.
Next action: Run restore readiness check using the restore runbook.
Smoke tests are present but warning state prevents full green readiness.
Next action: Review smoke warnings and create a follow-up task.
No open critical incident is shown in mock data. Incident records remain read-only.
Next action: Keep incident records reviewed before release approval.
Monitoring and observability are partially represented by operations records.
Next action: Complete monitoring coverage before full production readiness.
Security state is summarized safely. No secrets, tokens, raw logs, or raw PII are rendered.
Next action: Review security checklist without exposing credentials or logs.
Release and rollback readiness is review-only until evidence is complete.
Next action: Prepare release checklist and rollback review task.
Freshness status controls whether operations can be trusted.
Next action: Refresh stale backup evidence before production decision.
Monitoring and security are shown as safe status summaries. No credentials, tokens, or raw logs are displayed.
Monitoring coverage is partial in MVP. Health records are visible, but live uptime, error tracking, and log coverage are not fully connected.
Security posture is summarized without credentials, tokens, raw logs, backup secrets, or raw PII. Full security checklist evidence is a follow-up before full production readiness.
Release and rollback status is readiness-only. No production deployment or rollback action is available.
Release and rollback readiness is informational only. Deployment and rollback controls are not available in the MVP dashboard.
Next action: prepare release checklist and rollback review task before production rollout.
Production readiness is evidence-based and remains limited while backup or restore evidence is stale or partial.
Current readiness is Production ready with limitations. Production readiness remains evidence-based and limited when restore, backup, smoke test, or monitoring evidence is incomplete.
Next action: Run restore readiness check before production rollout.
| Area | Score | Status | Evidence | Freshness | Blocker | Next action |
|---|---|---|---|---|---|---|
| Backup | 4/5 | Status: Needs review | Backup exists but latest restore test is not verified. | Freshness: Stale | Evidence is stale | Verify latest backup evidence |
| Smoke Tests | 4/5 | Status: Needs review | Basic checks pass with warnings. | Freshness: Fresh | Smoke Tests needs review | Review smoke test warnings |
| Automation Safety | 5/5 | Status: Healthy | External write execution count remains zero. | Freshness: Fresh | None in mock data | Keep evidence current |
| Documentation | 4/5 | Status: Needs review | Dashboard MVP docs exist and continue to evolve. | Freshness: Fresh | Documentation needs review | Review documentation evidence |
Risks that can block production safety, recoverability, or release confidence.
Recovery may fail or take too long during a production incident if restore is not recently verified.
Evidence: Restore readiness is partial.
Mitigation: Run a restore readiness check and record safe evidence.
Owner: CTO / OperatorA stale or unverified backup weakens recovery confidence before production changes.
Evidence: Backup freshness is stale.
Mitigation: Verify latest backup and link the backup record.
Owner: CTOWarnings or stale smoke tests prevent confident production readiness.
Evidence: Smoke test status is passed with warnings and freshness is fresh.
Mitigation: Review smoke test warnings and rerun manual smoke checks.
Owner: CTO / OperatorUnknown critical system health prevents an evidence-based production-ready decision.
Evidence: 1 component(s) are unknown or down in mock system health.
Mitigation: Connect or record health checks for database and critical components.
Owner: CTOReadiness with limitations means release decisions still need manual review.
Evidence: Production readiness is Production ready with limitations. Incident freshness is fresh.
Mitigation: Complete readiness checklist before accepting production risk.
Owner: Founder / CTOSafe next steps for Founder, CTO, or Operator. These create review work, not production actions.
Restore readiness is partial and should be verified before production rollout.
Backup freshness is stale, so backup evidence should be refreshed.
passed with warnings should be reviewed before release approval.
Production readiness is limited until backup, restore, monitoring, security, and rollback evidence are complete.
Security status must stay summarized safely without exposing credentials, tokens, raw logs, or raw PII.